Start / Commodities / Gold/ Cabreúva
PROJETO BOM JARDIM DE GOIÁS - ALVO CABREÚVA

ANM PROCESS Nº 812.488/1974
ANM PROCESS 861.351/2021 e 861.326/2021
Project and Location:
- Total area of 2371.96 hectares in the west of Goiás, municipality of Bom Jardim de Goiás.
Research Objective:
- Mineral occurrences in the area, with a focus on gold.
Results and Continuity Plan:
- Targets of interest defined for gold, with presence of hydrothermal alteration zone.
- Continuation of sampling for surface geochemistry, detailed mapping, diamond drilling and technical and economic feasibility studies.
- Partial Research Report filed with the National Mining Agency.

WORK CARRIED OUT IN THE AREA BY AXIA MINERAÇÃO:
The mineral research program developed by Axía Mineração S.A., over the three years of validity of the license, included:
Table relating to the activities carried out.
Trabalhos Realizados | Descrição |
---|---|
Área Mapeada em escala 1:25.000 | 23,7 km² |
Amostras de geoquímica de rocha, solo, sedimento de corrente e concentrado de batéia | 1.400 amostras |
Levantamento de geofísica Terrestre – Gamaespectometria | 17,5 km |
Levantamento de geofísica Terrestre e Drone – Magnetometria | 15 km² |
Levantamento de geofísica Terrestre – Polarização Induzida | 5 linhas / 8,6 km |
See all the details in our portfolio.
